Heavy civil works · INAA Infratech

Tank Foundations & Circular RCC Structures

From circular setting-out to foundation handover.

Illustrative construction and architecture photograph

Work scope and checkpoints

Setting out

Confirm the tank centre, radius, orientation and foundation geometry against the approved drawings.

Reinforcement and concrete

Review cover, laps, embedments and formwork before concrete placement. Coordinate sampling, curing and inspections.

Handover

Verify geometry and top levels before release for subsequent steel or tank works.

Discuss your project

Request a quote ›

Circular foundation checkpoints

Survey references

Confirm tank centre, radius, orientation and the founding level against the drawings.

Subgrade and levelling course

Review preparation and readiness of the base before fixing reinforcement.

Pre-pour coordination

Check circular bar spacing, laps, covers, embedded items and formwork geometry.

Release for tank works

Review concrete records, top levels and surface conditions before subsequent work.

Construction in pictures

Illustrative views of construction, engineering and the built environment.

Structural site work
Structural site work
Commercial architecture
Commercial architecture
Warehouse interior
Warehouse interior
Project drawings
Project drawings