INAA Infratech · Nagpur, Maharashtra

Industrial Buildings & Warehouse Civil Works

Civil construction for warehouses, pre-engineered buildings and production sheds. Coordinate the structure, floor and loading yard around how the facility will operate.

Explore the civil scope
Finished industrial floor with central steel columns
Completed industrial shed interior
Industrial construction in Nagpur

Plan the building around what moves through it.

A warehouse has to accommodate goods, vehicles and people from the gate to the storage area. INAA Infratech coordinates civil works for warehouses, production sheds and industrial storage buildings with the approved steel drawings, operating layout and finished levels. We review floor zones, truck routes and drainage early so the building and yard work together.

Warehouse civil construction

From formation level to loading yard.

Site preparation

Set out the building grid and finished levels. Prepare excavation, fill and compaction around planned access and staging areas.

PEB foundations

Build RCC footings, pedestals and grade beams to the approved design. Check anchor-bolt position, projection and pedestal levels with the steel erection team.

Industrial flooring

Prepare and verify the subgrade and sub-base. Coordinate floor finish, joints and curing with equipment zones and the approved operating requirements.

Docks, ramps and drainage

Coordinate loading approaches, ramps, trench crossings and drains with yard levels, dock positions and truck routes.

Illustrative civil works and reinforced concrete construction on site
Floors & logistics

Design decisions before the concrete pour.

The layout should reflect how the facility will be used. Share the intended storage system, material-handling equipment and traffic routes so the project team can review the civil interfaces before releasing the floor work.

  • Rack and forklift zones, floor finish and joint locations
  • Equipment foundations, trenches and embedded services
  • Dock thresholds, ramp transitions and yard drainage levels
Construction sequence

Three handoffs that keep work moving.

01

Set out the site

Confirm the approved grid, formation levels, access and material storage before earthworks begin.

02

Release the steel interface

Review foundation records and anchor-bolt checks with the erection team before releasing the work front.

03

Review floor and yard readiness

Review inspections, approach levels and outstanding items with the client before handover to the next team.

Illustrative construction personnel working on site
Illustrative team reviewing drawings to coordinate construction
Project FAQs

Before you request a quote.

What should I share for a PEB civil quote?

Send the site location, intended building use, available PEB layout and structural drawings, tentative timeline, and floor and loading requirements. Ground investigation or survey information helps refine the scope where available.

How do you coordinate civil works with the PEB supplier?

The teams work from approved foundation reactions, anchor-bolt layouts and pedestal details. Site checks confirm the agreed interfaces before the erection team takes over.

Can the scope include external works?

Loading ramps, truck paving, drainage, trenches and approaches can be discussed as part of the package. Share the site layout and external levels to clarify the boundaries.

Discuss your project

Planning a warehouse or industrial shed?

Send your drawings, site location and target schedule to our Nagpur team so we can discuss the civil scope and next steps.

Request a quote

Explore all construction services

Additional images are illustrative.