INAA Infratech · Nagpur, Maharashtra

Industrial Plant & Heavy Civil Works

Tank foundations, equipment bases and process-area civil construction coordinated with plant teams, consultants and installation contractors.

Explore the civil scope ↓
Plant civil construction

Coordinate civil works around the plant layout.

INAA Infratech works with industrial clients to define the civil package from initial set-out through release to installation. The work starts with approved plant and equipment layouts, civil drawings, site levels, access arrangements and the intended order of installation.

For plant expansions, the scope review also considers existing services, operating access and which areas the plant team can release for construction.

Civil construction scope

Foundations, structures and services.

Tank & vessel foundations

Circular reinforced concrete foundations, ring walls and support bases. Coordinate centre points, finished levels, reinforcement and embedded items with the approved tank drawings.

Machine & equipment bases

RCC blocks, pedestals and machine foundations. Verify bolt patterns, sleeves, pockets and top elevations against the approved vendor information.

Trenches, pits & process areas

Utility trenches, service crossings, pits, drains and process-area paving. Coordinate slopes, openings, access and interfaces with adjoining civil and installation work.

Illustration of circular reinforcement and formwork for an industrial tank foundation
Illustrative tank foundation
Circular RCC tank foundations

Confirm geometry before concrete placement.

Tank foundations depend on the approved centre, radius and top elevation. The civil team reviews the base preparation, reinforcement and formwork with the project team before the pour. Agreed checks and survey records help the tank installation team verify the interface at handover.

Inspection and records

Check equipment interfaces at each hold point.

The inspection plan identifies checks before placement and before release. Records are compiled to the agreed scope and acceptance requirements.

  • Anchor bolt location, orientation and projection
  • Formwork, reinforcement, embedded items and levels
  • Concrete sampling, curing records and observation close-out
Illustration of engineers inspecting anchor bolts on an equipment foundation
Illustrative equipment foundation inspection
Execution and handover

Release each work area to the next team.

Align civil completion with the installation programme and the records the receiving team needs.

  1. Set out and coordinate

    Confirm drawings, boundaries, survey references and access.

  2. Construct and inspect

    Carry out the civil works and document the agreed inspections at each stage.

  3. Verify and hand over

    Review dimensions, outstanding observations and the required release records with the receiving team.

Project FAQs

Before you scope the package.

What should I share for a heavy civil works quote?

Send the site location, civil scope, plant layout, equipment or tank drawings, available ground information and target dates. Identify the work areas and installation dependencies.

Can you coordinate with equipment suppliers?

Yes. Share the supplier’s approved drawings, anchor and embed details, tolerances and inspection requirements so the interfaces can be reviewed with the installation team.

Can the scope include plant expansion work?

Expansion packages can be discussed around existing services, operating areas, access restrictions and the site’s work permit arrangements.

Project enquiries

Discuss your plant civil package.

Share your drawings, work-front priorities and handover schedule with our Nagpur team.

Request a quote →