Industrial Sheds & Warehouses
Civil delivery for industrial sheds and storage
An overview of warehouse and pre-engineered building civil works featured in the company catalogue.
Explore the details ›INAA Infratech
From steel interface to flooring
01Foundation readiness
Foundations, pedestals and anchor-bolt grid checks before steel erection.
02Industrial flooring
Sub-base compaction checks, floor levels, joints, finish and curing.
03Operational access
Coordination of trenches, drains, loading access and external works.
Discuss your project
Contact our Nagpur team ›Warehouse project checkpoints
01
Site establishment
Set out building lines and coordinate excavation and access with the work programme.
02
Civil and steel interfaces
Verify pedestal levels, anchor-bolt orientation and template stability before erection.
03
Floor and drainage coordination
Review floor level, slope, joints, curing, drains and trenches.
04
Handover sequence
Confirm readiness of loading areas, ramps, external access and outstanding civil items.