Setting out
Confirm the tank centre, radius, orientation and foundation geometry against the approved drawings.
From circular setting-out to foundation handover.
Confirm the tank centre, radius, orientation and foundation geometry against the approved drawings.
Review cover, laps, embedments and formwork before concrete placement. Coordinate sampling, curing and inspections.
Verify geometry and top levels before release for subsequent steel or tank works.
Confirm tank centre, radius, orientation and the founding level against the drawings.
Review preparation and readiness of the base before fixing reinforcement.
Check circular bar spacing, laps, covers, embedded items and formwork geometry.
Review concrete records, top levels and surface conditions before subsequent work.